Tag: Remodel

  • Case Study: The Department Store

    Case Study:
    The Department Store

    The Department Store is an early example of steel frame construction, built in 1905 and extended several times. With no original drawings, extensive structural investigation was required.

  • Case Study: 469 Bethnal Green Road

    Case Study:
    469 Bethnal Green Road

    A 1970s concrete warehouse extended by three storeys rather than demolished – its existing foundations retained through geotechnical assessment and a lightweight structural strategy.

  • Case Study: Neighbourhood North

    Case Study:
    Neighbourhood North

    Neighbourhood North is a clear demonstration of how structural retrofit can unlock the value of existing commercial buildings while delivering substantial carbon and performance benefits. 

  • Case Study: 30 Cleveland Street

    Case Study:
    30 Cleveland Street

    30 Cleveland Street demonstrates how an early twentieth-century steel-framed office building can be refurbished and extended while retaining its primary structural system and architectural character.

  • Case Study: 10 Greycoat Place

    Case Study:
    10 Greycoat Place

    10 Greycoat Place is a six-storey former warehouse in Westminster, retained and extended rather than demolished, delivering contemporary commercial office space while preserving the embodied value of the existing structure.