Category: Case Studies
Filter by
-

Case Study:
33-36 Queen StreetAdaptive reuse and bespoke structural interventions honouring the heritage of a Victorian printworks while delivering sustainable, modern office functionality in Belfast city centre.
-

Case Study:
Weavers CourtThe adaptive reuse of an 1840s linen warehouse demonstrates how structural reassessment and targeted repair can unlock new commercial life for buildings previously earmarked for demolition.
-

Case Study:
The Department StoreThe Department Store is an early example of steel frame construction, built in 1905 and extended several times. With no original drawings, extensive structural investigation was required.
-

Case Study:
469 Bethnal Green RoadA 1970s concrete warehouse extended by three storeys rather than demolished – its existing foundations retained through geotechnical assessment and a lightweight structural strategy.
-

Case Study:
Rafter WalkThe Rafter Walk bridge demonstrates how repurposed materials can play a central role in modern structural engineering – not as a compromise, but as a carbon-conscious design choice.
-

Case Study:
Kinning Park ComplexA 1916 red sandstone school building, refurbished and extended rather than replaced – transformed into a flexible community hub while retaining its original structure, character and social value.
-

Case Study:
Animal Studies CentreThe Animal Studies Centre demonstrates how deep structural refurbishment transform a twentieth-century building into a high-performance education facility while retaining embodied value.
-

Case Study:
Neighbourhood NorthNeighbourhood North is a clear demonstration of how structural retrofit can unlock the value of existing commercial buildings while delivering substantial carbon and performance benefits.
-

Case Study:
30 Cleveland Street30 Cleveland Street demonstrates how an early twentieth-century steel-framed office building can be refurbished and extended while retaining its primary structural system and architectural character.
-

Case Study:
10 Greycoat Place10 Greycoat Place is a six-storey former warehouse in Westminster, retained and extended rather than demolished, delivering contemporary commercial office space while preserving the embodied value of the existing structure.
-

Case Study:
New Olympia HouseNew Olympia House demonstrates how an existing historic structure can be refurbished and adapted for new use through targeted structural intervention and repair.
-

Case Study:
Hay CastleHay Castle is an example of large-scale, retention-led structural engineering applied to a scheduled ancient monument with nearly a millennium of layered history.
-

Case Study:
Bromley Old Town HallThe conversion of Bromley Old Town Hall demonstrates how two listed civic buildings, long in decline, can be brought back into active use through careful structural retention, targeted repair and sensitive adaptation.
-

Case Study:
Bradford LiveBradford Live is a compelling example of repair-led structural engineering, demonstrating how careful investigation and targeted intervention can revive a highly degraded historic structure.
-

Case Study:
Vestry House MuseumExtensive refurbishment of the existing listed Vestry House Museum and its more modern rear extension. The extension features an entirely new roof, which reuses the joists from the existing roof, laid flat as sarking boards spanning between new roof trusses.
-

Case Study:
Sheep Field BarnRetrofit of an existing barn building into a new learning hub at the Henry Moore Foundation’s headquarters in Perry Green, Hertfordshire.
-

Case Study:Alexandra Palace House
The project involves the conversion of two flats into a single, family home in North London. The ambition was to create a sustainable family home with real architectural merit. The existing end of terrace house is built from traditional load-bearing masonry with timber-joisted floors.
-

Case Study:Holbein Gardens
Holbein Gardens is a retained and extended 1980s concrete-framed commercial building, refurbished with Barr Gazetas architect for Grosvenor, to create a modern sustainable workplace with increased floor area. The building includes a 2-storey upward extension, with a roof terrace over an existing 4 storey building plus basement.