Author: donna.gage@terc.org.uk

  • Event:Building Resilience Through Reuse4 November 2026: London

    Event:
    Building Resilience Through Reuse
    4 November 2026: London

    We’re delighted to be partnering with ASBP and other industry leaders on this full day event to champion the reuse agenda and drive change across the built environment. We’ll be leading a workshop on designing for reuse as a risk management strategy.

  • Case Study: The Department Store

    Case Study:
    The Department Store

    The Department Store is an early example of steel frame construction, built in 1905 and extended several times. With no original drawings, extensive structural investigation was required.

  • Case Study: 469 Bethnal Green Road

    Case Study:
    469 Bethnal Green Road

    A 1970s concrete warehouse extended by three storeys rather than demolished – its existing foundations retained through geotechnical assessment and a lightweight structural strategy.

  • Case Study: Rafter Walk

    Case Study:
    Rafter Walk

    The Rafter Walk bridge demonstrates how repurposed materials can play a central role in modern structural engineering – not as a compromise, but as a carbon-conscious design choice. 

  • Case Study: Kinning Park Complex

    Case Study:
    Kinning Park Complex

    A 1916 red sandstone school building, refurbished and extended rather than replaced – transformed into a flexible community hub while retaining its original structure, character and social value. 

  • Case Study: Animal Studies Centre

    Case Study:
    Animal Studies Centre

    The Animal Studies Centre demonstrates how deep structural refurbishment transform a twentieth-century building into a high-performance education facility while retaining embodied value. 

  • Case Study: Neighbourhood North

    Case Study:
    Neighbourhood North

    Neighbourhood North is a clear demonstration of how structural retrofit can unlock the value of existing commercial buildings while delivering substantial carbon and performance benefits. 

  • Case Study: 30 Cleveland Street

    Case Study:
    30 Cleveland Street

    30 Cleveland Street demonstrates how an early twentieth-century steel-framed office building can be refurbished and extended while retaining its primary structural system and architectural character.

  • Case Study: 10 Greycoat Place

    Case Study:
    10 Greycoat Place

    10 Greycoat Place is a six-storey former warehouse in Westminster, retained and extended rather than demolished, delivering contemporary commercial office space while preserving the embodied value of the existing structure. 

  • Case Study: New Olympia House

    Case Study:
    New Olympia House

    New Olympia House demonstrates how an existing historic structure can be refurbished and adapted for new use through targeted structural intervention and repair.